TECHNICAL DESIGNS AND SUPERVISION OF CONSTRUCTION WORKS
- Consultancy for feasibility study and associated preliminary and detailed designs for infrastructure in secondary cities and the feasibility study of upgrading of the Agatare informal settlement in Nyarugenge District.
- Feasibility Study of upgrading the Rwanza handcraft production center
- Description of the Project Detailed technical study for construction works of Kabarondo Modern market at Kabarondo sector in Kayonza District
- Detailed technical study for construction works of Cyarubare Modern at Cyarubare Center in Kayonza District
- Detailed technical study for construction works of NYAGATARE Stadium
- Detailed technical study and preparation of tender documents for construction of 3 floors building that will serve as an administration Block of RUKARA College of Education(RCoE)
- Detailed technical study for construction works of AGASEKE Promotion Project House
- Detailed technical study for construction of AGAKIRIRO in Rwamagana District
- Detailed technical study for construction of a 3 floors modern market at Mukarange in Kayonza District
- Architectural and technical designs and preparation of tender documents for constructions works of staff houses, student’s dormitory, multi-purpose hall, fence, external latrine and external store for Tumba college of technology
- Study and Supervision of construction of administration block for Kibagabaga Hospital
- Architectural and technical designs and elaboration of bidding documents for RWAMAGANA District pharmacy.
- Architectural and technical designs and elaboration of bidding documents for constructions of 62 classrooms, 20 blocks of latrines with 6 toilets each, 1 Health center, 2 volleyball playgrounds, 24 houses for poor families, 1 underground water reservoir of 50 Cu.m, 2 water tanks of 10 cu.m, and 20 water springs.